1/10/2026Can You Work It Out? Our Riddle from the e-news.

Two colleagues, one break, one task: What time will the fall catalogs be ready to ship?
The Fall Shipping
Lisa and Ben are supposed to work together to prepare the new fall catalogs for shipping. If she worked alone, it would take Lisa 6 hours to complete the task; if he worked alone, it would take Ben 4 hours. They start working together at 8:00 a.m.
1. After working together for 1 hour, Ben has to leave for a client meeting.
2. Meanwhile, Lisa continues working alone for 30 minutes.
3. After that, Ben returns, and they both continue working together until everything is packed and ready to ship.
What time will the shipment be completely finished?
Solution
Lisa completes 1/6 of the shipment per hour, while Ben completes 1/4. Together, they therefore complete 1/6 + 1/4 = 5/12 of the shipment per hour.
Hour 1 (8–9 a.m.), both working together: 5/12 of the shipment is complete.
Ben takes a 30-minute break (9–9:30 a.m.), while Lisa works alone: She completes an additional 1/12 of the shipment in those 30 minutes.
By 9:30 a.m., 5/12 + 1/12 = 6/12, meaning half the work is complete—a useful checkpoint for assessing their progress.
Starting at 9:30 a.m., both working together again: Half (1/2) of the shipment remains. At a combined rate of 5/12 per hour, they will need (1/2) ÷ (5/12) = 6/5 hours, or 1 hour 12 minutes.
9:30 a.m. + 1 hour 12 minutes = 10:42 a.m.
Therefore, the shipment will be completely finished by 10:42 a.m.